17-19Oct20 FPP KNG Septic Tank Program Water Committee Site Visit
17-19Oct20 FPP KNG Septic Tank MTU iDesign Support The students from Michigan tech reported that insufficient topographic data was available to them to proceed with the design of the septic tank system in the village. Footprints was asked to return to Kuna Nega and develop additional details. What was missing was confirmation that the previous survey route for piping would provide sufficient slopes. This would be needed to assure that the entire system flow downhill by gravity. It’s important because this will eliminate the need for electrical pumps, lift stations, this reducing maintenance and operations cost. Footprints was pleased that the Village water Association was present. They attended the entire site visit and we’re helpful in directing our data collection efforts. The main obstacle to these types of projects is private property rights. Each of the residents would choose to have the septic service but does not want the utilities crossing their property lines. Although there are common and community property access corridors, one cannot eliminate the need to cross private property. This is especially the case when the entire system must flow downhill by gravity. The association would be in charge of negotiating these limited conditions and developing agreements with property owners were needed. The results of the survey were provided to Michigan tech. They will use it in developing the final design. Meetings are held weekly with the design teams and the program is advanced at this stage. We look forward to a complete set of drawings, specifications, bills of materials, schedules and cost estimates. Our thanks to the Kuna Nega water Association and the students and mentors of Michigan tech.
Suggested videos

180725 FPP Marketing Video GWright FINAL
Rick Montanari - FPP2 · 0:35

200215 PHO UKeepIt Reuse Clean Plastic Film
Rick Montanari - FPP2 · 0:26

201102 FPP PN Water Tank Maintained
Rick Montanari - FPP2 · 1:26

26Oct-17Nov20 MTU iDesign KNG Septic Tank DRAFT Final Design Progress
Rick Montanari - FPP2 · 1:54

31Mar21 OCL Olotepesi Foundations Site Progress
Rick Montanari - FPP2 · 2:04

210315 FPP San Lorenzo SSF Spring Box Maintained
Rick Montanari - FPP2 · 1:30

14Nov20 FPP San Lorenzo SSF Site Visit OnM Status
Rick Montanari - FPP2 · 1:42