On this data center project, our Field Application Engineer is using engineering grade augmented realityโ„ข (AR) to verify the installation of electrical containment - right at the point of install. By leveraging the sectioning tool, they identified a misalignment with the design model immediately, before it could escalate into a costly issue. The moment the discrepancy was detected, it synced automatically to our quality dashboard on the XYZ Platform. This ensured the Client and General Contractor were alerted in real time, enabling quick corrective action and saving valuable time and resources. With XYZ, you stop issues at the source - ensuring quality from the start. #construction #datacenter #datacentre